10/27
ESCEE.com - 2007 - Sandouping and Wuhan - 10/27
travel log
Shortly thereafter, we made our way to the Gezhouba Dam, downstream from the TGD, and which still operates today at a capacity of 2,715 MW (note the dramatic difference between this and the TGD's 22,500 MW capacity). We passed through the locks.
previousupnext
Copyright © 1997-2025 ЯTR/escee.com. All rights reserved. Neither images nor text may be reproduced without express written consent from copyright holder.
ESCEE.com